Front Parlour College Seal
The original Seal was printed on linoleum and had deteriorated badly. In addition, the building (built in 1901) had settled, causing the floors to "dome." Replacement of the linoleum Seal with a hardwood, laser cut Seal. Click on the image to the right for more detail about this job. |
  |
 |
|
|   |
 |
  |
Gym Rear Steps
Replacement of the crumbling concrete & slate steps in the back of Reeves Gym. Click on the image to the left for more detail about this job. |
|
|   |
Smith Courtyard Paving Stone Project
Removal of the asphalt paving and replacement with paving stones. Click on the image to the right for more detail about this job. |
  |
 |
|
|   |
 |
  |
Lotte Hall Fascia
Replacement of the crumbling fascia on Lotte Hall. Click on the image to the left for more detail about this job. |
|
|   |
Dorm Buildings Window Replacement Project.
Removal of the old crank-out steel windows and replacement with new vinyl casement windows. Click on the image to the right for more detail about this job. |
  |
 |
|
|   |
 |
  |
The Quad
Replacement of the crumbling asphalt walkways in the Quad. Click on the image to the left for more detail about this job. |
|
|   |
Athletic Field Renovation Project.
Complete renovation of the Centenary College Athletic Fields. |
  |
 |
|
|   |
 |
  |
Executive Parking Lot
Parking lot was crowded. It was expanded 20 feet, resurfaced and striped. Click on the image to the left for more detail about this job. |
|